Pet Leashes Rope Outdoor Training Running Dog Leash Belt  Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Black / S 1.5m
Sale price  $17.99 Regular price  $45.00
Skip to product information
Pet Leashes Rope Outdoor Training Running Dog Leash Belt  Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Sale price  $17.99 Regular price  $45.00

 Description:

  • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
  • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
  • LONG DOG LEAD-  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI

Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead

Intentional design

We make things that work better and last longer. Our products solve real problems with clean design.

Quality first

We obsess over the details and strive to deliver the best products at the best prices, every time.

Customer care

We're always on your side: keeping our loyal customers happy is our top priority and number one goal.

Feature 1

Made with care and unconditionally loved by our customers, this signature bestseller exceeds all expectations.

Feature 2

Made with care and unconditionally loved by our customers, this signature bestseller exceeds all expectations.

At the heart of every product lies a unique story, driven by our passion for quality and innovation. Each item enhances your everyday life and sparks joy.